Remediation Investigations & Installation (Phase III)

 
Block Environmental
  
23 Musick Suite 100  
Irvine, CA 92618 - USA  
(Located In Irvine Spectrum)  

(949) 455-0325  
Fax (949) 455-1958  

Email:  
eblock@blockenvironmental.com  

• Feasibility studies are conducted to determine the optimal mode of remediation (cleanup activities).  Alternatives are evaluated based on their technical feasibility and cost.  The owner’s requirements for the land while remediation is in progress are also considered in the analysis. Under some circumstances, regulatory case closure can be obtained without remediation.

• Our solutions always take in consideration technical feasibility, the Client’s near term use of the property, and cost.  After careful consideration of these factors, in consultation with the Client, a mode of remediation is selected.

 

  BlockEnvironmental.com © 2013
  All Rights Reserved - Worldwide